Project Description
Tabley Court is a 1,170 sq ft commercial building based in Altrincham. We have been working on a large internal and external electrics project at the site which includes power systems and lighting installation plus computer networks, LED lighting and power savings.
In terms of the power systems installation, we started the work by ensuring that all aspects of the electrical installation and design were taken into account. So we could suppress the risk of a power supply overload which can result in fire.
We also used electrical installation design software to ensure the electrical distribution systems comply with current regulations. This gave our expert engineers the green light to carry out the power systems installation safely and swiftly. Included in the works was a computer network set up for the office environment.
The same level of care was applied to the new lighting installation. We worked closely with the client to understand their lighting requirements and used state-of-the-art design software to ensure each luminaire type chosen matched the client’s specifications. All the while considering high-performing, cost-efficient and aesthetically pleasing lighting solutions.
This led us to install LED luminaires that feature 50,000 hrs lamp life, 3-5 years warranty, top-tier colour rendering, dimming capability and many more valuable features. This enabled the client to reap the perks of huge reductions in energy costs, minimal maintenance costs and enhanced lighting control.