+Well – Phase 1

  • Well Pharmacy, Stoke

  • Lighting, power and containment

The electrical installation works have been completed at Well Pharmacy’s 7,500 sq mtr warehouse and distribution centre in Stoke.  The electrical installation works consisted of LED lighting to a new mezzanine floor and new office space, a containment system, mains and small power distribution to feed the power and lighting in all areas.  Works have been completed on time and within budget.

+Well – Phase 2

  • Bestway Medhub, Stoke-on-Trent

  • Low energy LED lighting installation

+Well’s Bestway Medhub warehouse in Stoke-on-Tent is fully automated and one of the biggest pharmaceutical wholesale sites in the UK.

One of our most prolific clients, +Well is the third largest pharmacy chain in the UK.

Energy consumption and increased lighting levels were the main aim of this project, due to +Well’s Green Commitment project. By removing the existing high-level, high energy consuming discharge lighting systems, we were delighted to reduce power consumption by 50%.

Not only is power consumption reduced, with our expertise LED lighting installation, we were able to increase lighting levels by 20%.

Due to there being no requirement for re-lamping, our LED lighting solutions are also a great low maintenance option for large warehouses like this.

The results from this project were a huge boost to +Well’s Green Commitment, giving them annual savings of 146.1 tons of Co2.

The luminaries incorporated technology from Tridonic, Osram and ExOr, carting 5 year warranties and manufactured in the United Kingdom.

Contract Services R&R Ltd, CEG & Liverpool John Moores University

  • Exchange Station, Liverpool Project Type

  • Large scale electrical refurbishment

In 2018, we completed a large-scale electrical refurbishment for CEG, one of Liverpool’s main land owners.

The work took place within the basement, ground, first, second, third and fifth floors of Exchange Station which is based in the centre of Liverpool. Deborah McLaughlin, Executive Director of CEG calls the building the “cornerstone of the central business district.”

It was a large technical project with a final budget in excess of £750,000. Using our own directly employed, experienced specialists to carry out the new wiring infrastructure, lighting, communications cabling, mains and power distribution systems, we rose to the challenge, and brought the project in on time and within budget.

All aspects of electrical installation and design were taken into account during the project, using our own Trimble electrical design software, Relux lighting design software and AutoCad architectural program, we were able to demonstrate to our client that the installation would perform and cope with the future requirements of the tenant Liverpool John Moores University.

As well as the power infrastructure and Cat 6A communications installation, the building’s fit out included a complete new lighting installation which required the carefully considered design of each floor within the building to ensure the required lighting levels and uniformity was achieved and maintained. Moreover, we designed the lighting with cost-efficiency in mind to ensure the client gained their desired aesthetics without incurring increased costs. The new energy efficient LED lighting was installed throughout to increase longevity and less demand on energy consumption. As a result, our clients benefited from superb colour rendering, minimal maintenance costs, enhanced output and massive reduction in energy costs.

Talke 16

  • Talke 16 warehouse, Stoke

  • Electrical and lighting installation including inspection and testing

Talke 16 is a 180,100 SQ FT refurbished warehouse and manufacturing facility based in Stoke. In 2018, we completed a project at the site which cost around £300k. The work was carried out throughout the building and included two new main switch panels, new mains distribution boards, small power distribution and new LED lighting installation over the entire square footage.

As the new incoming tenant inherited a mains and sub mains distribution system which was obsolete and in poor condition, it was decided that a new mains distribution system throughout the building would be installed, starting from the two existing LV substations and switchrooms. The systems were designed to suit the demand, application, and location. This ensured Talke 16 benefited from enhanced usability and practicality. Plus, to ensure electrical safety, the installation was NICEIC inspected, tested, and certified to British standards and the current IEE Regulations.

Our in-house and approved lighting specialists, Ozone Lighting Solutions, surveyed the warehouse’s existing lighting and carried out energy and maintainability assessments. New energy-efficient lighting was installed featuring low-energy LED luminaires with a lifetime in excess of 50,000 hours with less than half of the energy demands than the traditional fittings, incorporating intelligent lighting controls which monitor occupancy levels and lets the user make decisions of where low and high traffic areas are to place stock in the correct area to reduce energy usage further. The new lighting installation ensured Talke 16 benefited from low maintenance and cost efficiency while gaining increased light quality.

Upon completion the project was tested, commissioned and the building handed back to the client.

Mail Order Online Ltd

  • Southport

  • LED and lighting controls installation

A lighting system replacement project for Mail Order Online Ltd which resulted in huge benefits for the online retailer. Prior to our work, the company’s warehouse in Southport had high-energy consuming low output metal halide (MH) lighting.

MH lighting has major drawbacks when it comes to energy efficiency, lamp life and light output. These type of luminaires have high energy consumption, extremely long warm up periods to reach optimum brightness, suffer from lamp degradation and are expensive to maintain. When used to illuminate a large space like a warehouse, it can take up to 15 minutes to reach full brightness which means the lighting needs to be left permanently on throughout business hours. This results in energy being wasted in areas of non occupation.

The type of LED used in this project resolved these issues. As LED luminaires can be switched on and off instantly, the lighting incorporated occupancy and daylight detectors which switch the lighting off in racking aisles when there is no activity and dimming or switching off the luminaires individually when there is adequate daylight. The lighting installed also has a much longer life-span than MH lights and do not emit polluting radiation, making them safer and better for the environment.

By replacing the client’s MH lighting with LED luminaires, they benefited from huge reductions in energy costs. The work was also carried out through Carbon Trust funding to help the client save further costs on their energy spend. This meant that Mail Order Online has the capability to recoup the funds expended in their investment within a very short period.

Managing Spaces & Senator Office Furniture

  • Altham, Accrington

  • Complete fit-out of the building including electrics, networks and lighting

When Managing Spaces & Senator Office Furniture came to us in 2018, the Lancashire based office furniture manufacturer needed a complete electrical, communications networks and lighting fit-out of their premises on the ground and first floor areas, we immediately jumped at the opportunity. This was to include the complete modern face-lift of office space, meeting areas, conference facilities and a new showroom for their products.

Initially, we sent our highly-experienced design engineers and project management team to visit the site. A survey of the premises was carried out to understand the level of work required and working with our client, Managing Spaces Ltd, we were able to agree the design and scope of works required for the complete face-lift.  Working closely with the principle contractor, our project management, design engineers, electrical and communications cabling installations teams were able to bring the project together in consideration of British Standards and health and safety regulations. The final result is a premium working environment, providing well-being for staff, and a fantastic area to showcase Senator’s high quality office furniture and high spec products, designed to stand the test of time and enhance the new Senator brand and corporate image.

Globus

  • Trafford Park, Manchester

  • Brand new installation of LED lighting

Globus is an international leader in hand protection solutions based in Manchester. Prior to working with us, the company had out-of-date lighting solutions installed in its internal warehouse. As a result, substantial energy and maintenance costs were being incurred.

After surveying the site, we proposed replacing the existing lighting with LED luminaries. Through this upgrade, the client would experience massive reductions in energy costs, minimal maintenance costs, fantastic colour rendering (which ranges from 3000 kelvin warm white through to 6000 kelvin daylight) and many more benefits.

Once Globus accepted our proposal, the installation was carried out by our in-house lighting specialists, Ozone Lighting Solutions. They have an NICEIC UKAS accredited team who install lighting systems in full compliance with BS7671 IEE regulations. They are also ISO 9001 and ISO14001 accredited so quality is assured with as little impact to the environment as possible.

Thanks to the brand new installation of industrial LED lighting, Globus benefited from high output, low energy LED luminaires featuring enhanced operational efficiency. The LED lighting replacements also resulted in much better light quality with a colour temperature to suit the industrial environments of the warehouse. Additionally, the client has almost eliminated the frequent need and expensive to-hire access equipment to maintain its lighting.

Tabley Court

  • Tabley Court, Altrincham

  • Internal and external electrics and lighting

Tabley Court is a 1,170 sq ft commercial building based in Altrincham. We have been working on a large internal and external electrics project at the site which includes power systems and lighting installation plus computer networks, LED lighting and power savings.

In terms of the power systems installation, we started the work by ensuring that all aspects of the electrical installation and design were taken into account. So we could suppress the risk of a power supply overload which can result in fire.

We also used electrical installation design software to ensure the electrical distribution systems comply with current regulations. This gave our expert engineers the green light to carry out the power systems installation safely and swiftly. Included in the works was a computer network set up for the office environment.

The same level of care was applied to the new lighting installation. We worked closely with the client to understand their lighting requirements and used state-of-the-art design software to ensure each luminaire type chosen matched the client’s specifications. All the while considering high-performing, cost-efficient and aesthetically pleasing lighting solutions.

This led us to install LED luminaires that feature 50,000 hrs lamp life, 3-5 years warranty, top-tier colour rendering, dimming capability and many more valuable features. This enabled the client to reap the perks of huge reductions in energy costs, minimal maintenance costs and enhanced lighting control.

Artez

  • 17-19 York Place, Leeds

  • Category A Fit Out

Konect has successfully completed electrical installation works at 17-19 York Place in Leeds. The Category A fit out works were undertaken to three floors of the Grade A office building.  The works were completed on time and within budget.  The four-storey building, which comprises of three Georgian townhouses, provides 17,590 sq ft of prime office accommodation in the central business district together with 16 parking spaces

Lodge Tyres

  • Liverpool

  • Low energy Lighting

On behalf of Ozone Lighting Solutions, Konect has recently installed new low energy luminaires at Lodge Tyres’ depot in Liverpool. The new lighting will improve efficiency and substantially reduce running costs. The Lodge Tyre Company first opened in 1935 and has grown significantly, now handling all major tyre applications and vehicle maintenance work.

System 3

  • Denton Hall Farm Rd, Denton, Manchester

  • LED Floodlighting

Konect has installed energy efficient LED floodlights at System 3 in Denton, Manchester. The new LED lighting will provide a long lifetime and heavily reduce any maintenance costs. System 3 is one of the UK’s leading manufacturers of high specification double glazed units for domestic and commercial applications.

ADT Workplace

  • Liverpool

  • Low energy Lighting

Electrical installations have been completed at Building 1, Manchester Green Business Park.  Works included the installation of under floor power track, new floor boxes, wall sockets, power supply and lighting to the kitchen and cellular office areas.

Ministry of Justice

  • HMP Whatton

  • Lighting

This project involved the design and installation of new perimeter lighting to the large twin sports field area of the prison. The design consisted installing wind down lighting columns complete with spiked collars and floodlights. The solution provided the prison with a low energy, virtually zero maintenance floodlighting system used to illuminate the external fence. Konect was employed directly by The Ministry of Justice and the project included all groundworks, cabling, installation of lighting and commissioning.

Private client

  • Three Valleys, France

  • Power, Lighting, Communications & Media Cabling

Konect has completed phase two of a refurbishment programme at a substantial 5 bedroom chalet in Le Chatelard, France. Works included a new wiring infrastructure to French standards (à la norme NF C 15-100) which encompass a new intelligent lighting control system, mains and small power distribution and communications and media cabling. Le Chatelard is in Saint-Martin-de-Belleville, a peaceful and traditional mountain village in the mighty Three Valleys.

Contract Services Ltd

  • 86 Deansgate, Manchester

  • Power & Lighting

86 Deansgate has been undergoing a full refurbishment programme. Konect’s latest involvement was working on the fit out to the 3rd floor creating a high quality, dynamic and cost effective office space.  The latest technology has been used to design and install a new LED and modular lighting system, mains power and a containment system.  Works were completed on time and within budget.

Eccles 6th Form College

  • Eccles, Manchester

  • Power & Lighting

Konect Electrical has completed works at Eccles 6th Form College.  Their Science, Maths and IT suites have been fully refurbished with new low energy fluorescent lighting, Category 6 data cabling, a new power infrastructure and fire alarm system modifications.  The new space offers an improved teaching and learning environment for teachers and students alike.  Works commenced at the end of July and have been carried out within budget and completed in time for the new academic year.  The college is one of the largest in the country, delivering high quality teaching and learning.

North West Ambulance Service

  • Sefton House, Bolton

  • Power & Lighting

Refurbishment works have been completed at Sefton House in Bolton for the North West Ambulance Service. Electrical works included new LED lighting, computer cabling and new UPS systems which have transformed Sefton House into a bright inviting space offering a stylish and modern working environment, using the latest technology. Sefton House accommodates support staff at the 111 call centre and the works have been carried out, with minimal disruption, in a fully occupied space to ensure the continuation of the vital 24 hour service. All works were carried out to a high standard, on time and within budget.

Liverpool Football Club

  • Liverpool, Merseyside

  • LED lighting, Power Distribution, Mains Distribution and Containment Systems

Liverpool Football Club have had a two floor extension to their offices and warehouse where they distribute their football kits.  Konect was responsible for installing a new lighting system.  Works were completed to a high standard, on time and within budget.

The GB Group

  • Chester Business Park, Chester

  • LED lighting, Power Distribution, Mains Distribution and Containment Systems

Konect was appointed as electrical contractor for the two storey office block refurbishment to the Foundation Office Building in Chester Business Park.  Works included installation of new LED lighting, power distribution, mains distribution and a containment system.  Chester Business Park is one of the North West’s most prestigious and largest office parks.

Comfy Quilts Ltd

  • Middleton, Manchester

  • Warehouse & Offices

Konect was appointed for a large design and build project for Comfy Quilts. The project consisted of a strip out of the existing electrical installation and replacement lighting, power and containment systems throughout the building.

Appliances on Line ( AO.com)

  • Bolton, Lancashire

  • Office Fit Out

Brand new headquarters for Appliances Online at 5A, The Parklands, Bolton, in the heart of Lancashire. Works consisted of low energy lighting over five floors of prime office space for the UK’s leading online domestic appliance retailer.  Works were completed on time and within budget.

Morson Project, Eccles

  • Eccles, Salford

  • Office Fit Out ( 5 floors )

Category B works to the new building for Morsons – the high profile technical services providers to BAE Systems and The Ministry of Defence.

Krispy Krème

  • Trafford Park

  • Fast Food Outlet

Category A and Category B fit out to the Krispy Krème donut outlet. The electrical works met the demands of both the machinery needed for the production line, whilst also providing a restaurant style area for the public to enjoy their refreshments.

Garage Shoes

  • Arndale Centre, Manchester

  • Retail Fit Out

A new bespoke fit out for Garage Shoes, a specialist in female footwear. The project consisting of new lighting and power which delivered a contemporary design and aesthetic appeal.

AEW Architects Ltd

  • AEW Zenith Building, Spring Gardens, Manchester

  • Commercial Offices

Category A landlords and Category B tenants fit out of the 4th floor, including small power, lighting and communications cabling.

Contract Services R&R Ltd

  • 196 Deansgate, Manchester

  • Commercial Office Fit Out

A bespoke fit out of a Grade 2 Listed Building in the centre of Manchester. This building in excess of 100 years old was modernised to the highest contemporary standard whilst complimenting the original features of the building without ruining its grade 2 listed status.

SIS Media Ltd

  • Media City, Trafford Park

  • Telecoms Satellite Communications Site

To the dry dock area at Media City, satellites were installed for the transfer of communications signals around the globe. Our works comprised of the cabling infrastructure, mains power and lighting to each of the satellite positions.